- Project Name : Breakwater restoration work during typoon damage restoration work at Namyang Port
- Project Owner : Pohang Regional of Oceans and Fisheries / Doosan Enerbility Co., Ltd.
- Period : Feb. 2024 ~ Aug. 2024
- Summary :
T.T.P Installation 640ea (40~64Ton), Tripod installation 1,124ea (5Ton), Concrete work 8,741m3, Raising and Reinstalling Breakwater Block 1LS