- Project name : Yeongam Solar power plant civil construction project (영암 태양광 발전소 토목공사)
- Project owner : Daemyung Energy (대명에너지(주)) / CJ Logistics (씨제이대한통운(주))
- Period : 2019.May ~ 2020.Jul
- Summary :
Ground stripping 1,059,564m2 / Excavation 931,357m3 / Blasting 295,509m3 / Drenage pipe construction 103,013m / Grit chamber 18EA