Project name : Bukok combined power plant (부곡 복합화력발전소 건설공사)
Project owner : LG Energy / GS E&C (LG에너지 / GS건설(주))
Period : 1999.FEB ~ 1999.JUN
Summary :
Grab Dredging
Soil : 205,731m3
Rock : 50,000m3