- Project Name : Intake and Discharge Box Works under the Phase 1 Permanent Facilities Construction Project at the Dangjin Terminal, Korea Gas Corporation
- Project Owner : Korea Gas Corporation / POSCO E&C Co., Ltd.
- Period : Jun. 2023 ~ Dec. 2026
- Summary :
Intake PC box line 723m, Discharge PC box 598m, Grab dredging 261,481m3, crushed stone 209,219m3, armor stone 17,829m3, PC block 1,207ea